2019
Introduction of truck telematics with transport order processing
Introduction of truck telematics with transport order processing
Conversion of the shredder dedusting system from wet to dry [...]
Renewal of the shear stand on the scrap shear
Installation of radiation detectors at all locations.
Construction of a new 3-storey administration building with adjoining warehouse.
Conversion of the "old" shredder system to a Lindemann Power-Zerdirator [...]
Participation in Albert Gogel GmbH
Expansion of the non-ferrous separation plant to include an induction [...]
Commissioning of the baling press at the Deizisau site with [...]
Inauguration of the newly built Plant II in Deizisau with [...]